|
back to the Industrial buildings portfolio Project: Automatic car wash, 2 levels Description: the project includes an administrative building and a fully automated ecological car wash. Address: Drumul Careiului st., Satu Mare Area: 550 sqm Phases: Plan of the urban zone 2009-2010, Architectural design 2010, construction started back to the Industrial buildings portfolio
|